Hi everybody, we're talking now about four quarter types. The first type four quarter is the VM preventive maintenance, it is represented routine work like maintenance grease and so on. It is done very quickly. The second type is predictive maintenance vd, which work on condition monitoring vibration, oil analysis and so on. Is the job within the fiber condition monitoring. The sir is mo modification, Mo type mo modification or upgrade hoax is MRC or CV mo Caesar and management of change FCB facility change receiver if there's a need the SSP it likely be Mo Mo directly.
If not, and is it is a standby unit will be cm corrective maintenance multi effective in production If it isn't effective in production, and it is high equipment high criticality, it will we break down the R p r. If it is there is no from other it will be as R as R or ot like issue the TV from warehouse or something now we were talking about both purity of soul superiority divided into two two is our concerning one month's priority series or during three months is pretty for over three months. We do the three to four preventive maintenance because we need to blend work and the very rare material and deliver what you will once a job. But it looks different than one period one or two. condition monitoring it needs some sometimes it's need planning and sometimes It is needed to correct the root cause error immediately corrective maintenance video that you want or to also that is bland or on is a seven day plan every week if equipment is not high critical So 30 234 are bland work fidelity, zero and one are unplanned or some of the vacation may take maybe take two or three or four videos two or three or four which is because it is need a paper or a lot of paper or break down urgent emergency it is a reality zero why it is zero.
Yes exactly. Because it is affecting production. There is not standby unit then the other is the depending on the status of the situation, maybe zero to 2013 or four. Thanks for your attention.